Putting lights up on the roof. We also put lights up around the boardwalk, deck and some of the trails to other cabins.
At least the roof's not steep!
Feral likes to help chase lines!
Finished Lights....and more of the same.
Propane top-up:
Another winter project is to bring all the empty propane bottles out to the deck to be refilled.
There is a boat that stops in to the bay to refill them.
Taking a 55-gallon drum of heating oil up to the crew cabins. Because of the ramp to the dock, high time is preferred for this task.
Maneuvering the heating oil around the propane bottles (which all have to be moved back to the storage area once they are filled).
We also got a drum of diesel so we can top up the tanks on Prime Time.
Of course, Jen wants to help...
Feral out on the deck to supervise all these activities!
One of the planks on the dock pulled out during a storm.
It and the cleat have been replaced!
She don't like, she don't like, she don't like.... Propane.
ReplyDelete